toggle visibility Search & Display Options

Select All    Deselect All
 |   | 
Details
   print
  Record Links
Author (up) Smalling, R.; Enright, J. url  doi
openurl 
  Title A Crusade on HSP Amber High Mast Yields Green with Plasma Type Journal Article
  Year 2015 Publication Energy Abbreviated Journal Energy Engr.  
  Volume 112 Issue 5 Pages 12-17  
  Keywords Lighting; Energy; lighting technology; light-emitting plasma; lighting transition; LEP; Washington  
  Abstract Naval Facilities Engineering Command Northwest (NAVFAC NW) Public Works Department (PWD) Everett recently completed a lighting replacement project at Naval Station (NS) Everett, Washington, utilizing a utility energy service contract (UESC) with Bonneville Power Administration (BPA). The project replaced 74 high pressure sodium (HPS) light fixtures with modern energy saving, light-emitting plasma (LEP) fixtures atop 80-foot light poles along the piers and wharf at NS Everett. The no-glare LEP bulbs last twice as long while using less than half the power of their HPS predecessors. This project was completed at a cost of $160,000 and will result in cost avoidances in annual operating and maintenance of over $16,000, with a payback under 10 years. This UESC-financed and executed project saves one percent of the total shore energy consumption cost. Through similar efficiency projects and energy conservation efforts, NS Everett has reduced power usage by 16 percent in the past year and 40 percent since 2003.  
  Address 2000 West Marine View Drive, Bldg 2000, Rm 242 Everett, WA 98207  
  Corporate Author Thesis  
  Publisher Taylor & Francis Place of Publication Editor  
  Language English Summary Language English Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN ISBN Medium  
  Area Expedition Conference  
  Notes Approved no  
  Call Number IDA @ john @ Serial 1219  
Permanent link to this record
Select All    Deselect All
 |   | 
Details
   print

Save Citations:
Export Records: